From CAD to Prototype: A Practical Design Review Checklist

From CAD to Prototype: A Practical Design Review Checklist

Before releasing CAD for a prototype, define the question the prototype must answer, verify the model revision and review the interfaces that matter to that question. Then agree the manufacturing assumptions and the evidence needed to accept the result. A visually complete model is not, by itself, a reason to order a physical part.

For an overview of the wider project stages, see the industrial design process guide (in Turkish).

This checklist is for product teams preparing a design review with a studio or prototype supplier in Turkey. It helps you separate a useful experiment from a sample that looks convincing but leaves the main uncertainty unresolved.

What is CAD prototyping?

CAD prototyping is the stage where a product is built and checked as a 3D model before any physical part exists. In CAD prototype design, the designer models every part, assembles them digitally and checks dimensions, clearances, interference and appearance renders. The same files then drive the physical prototype, whether it is 3D printed, CNC machined or cast in a silicone mould.

A digital model answers geometry questions quickly and without material cost. For example, it shows whether a connector clears the housing wall or whether a cover closes over the cable route. It cannot show how a material flexes, how a surface feels in the hand or whether a snap fit survives repeated use.

Those questions need a physical part, and the method you choose decides which of them that part can answer. Our guide to prototyping methods: 3D printing, CNC machining and silicone moulding compares the options. The checklist below covers what to review before you order that first part.

1. Give the prototype one primary job

Write a sentence beginning “After this prototype, we need to decide whether…” Possible endings include whether a user can reach a control, whether parts can be assembled in the intended order or whether the proposed outer form fits the installation space.

Record what the prototype will not establish. A model intended for appearance review should not silently become evidence of durability. A fit review should not be described as production approval. If several questions need different materials or construction methods, discuss separate samples rather than assuming one prototype can answer everything.

The studio’s design and prototyping services include modelling, development, prototypes and testing. Agree the particular evaluation within your scope before specifying the sample.

2. Check the file package and assembly interfaces

Identify the authoritative CAD revision, its units and the components included. Ensure the supplier receives the same revision the reviewers approved. List bought-in components and any geometry represented only by a simplified placeholder, such as an approximate connector envelope.

Review mounting locations, neighbouring parts, opening paths and access for assembly. Ask whether the model represents the installed condition or a different state. An interface review should explain how parts relate, not merely show each part separately.

Autodesk’s interference documentation describes checking selected bodies or components for overlap and optionally coincident faces. It also explains that some overlap may be intentional, such as a gasket represented before compression. Interpret the result in context instead of treating every flagged overlap as an error or a clean result as complete validation.

3. Review the chosen process with the supplier

State the proposed prototype material and manufacturing process, then ask the supplier which features require attention. Before any production tooling is ordered, work through the design for manufacturing checks before tooling so that wall thickness, draft and tolerances are settled first. Keep the intended production process visible as a separate assumption. A change of process deserves its own review; do not carry forward approval simply because the external shape is unchanged.

For injection-moulded parts, Protolabs discusses uniform wall thickness, ribs and parting-line placement as design considerations. Use these as questions for the relevant manufacturer, not as universal dimensions to copy into a different material or geometry.

Record supplier feedback against the exact feature concerned. “Manufacturing reviewed” is too broad. A useful note states what was assessed, which revision it applies to and which questions remain open.

4. Write the test before ordering the sample

Define who will evaluate the prototype, under what conditions and how observations will be recorded. For a usability question, describe the task and users. For an interface question, identify the mating components and the review method. Let the responsible specialists define suitable acceptance criteria rather than inventing a generic tolerance.

Hypothetical example: a team is developing a handheld controller and wants to check access to its rear connector. The first sample represents the housing and connector position. Reviewers attempt the intended connection sequence using the relevant cable.

The planned observation is whether the connection can be made without an unintended obstruction. The team records photographs and comments against the reviewed revision. This sample is not being used to establish electrical performance, environmental resistance or production durability. Those questions require separately defined evidence.

5. Make a clear release decision

Use three possible outcomes: ready for the defined prototype, ready after named changes, or not ready because a critical input is missing. Assign every unresolved issue an owner and a closure condition.

  • State the primary question and excluded conclusions.
  • Confirm file revision, units and included components.
  • Review interfaces, installation state and assembly access.
  • Record prototype material and process assumptions.
  • Resolve supplier questions relevant to the sample.
  • Define evaluation conditions and acceptance evidence.
  • Name the release owner and record the decision.

If the connector specification is missing, for example, the team may still approve an appearance sample while holding the connector-access evaluation. The release note must preserve that distinction so later reviewers do not mistake a limited approval for a broader one.

Frequently asked questions

Does an interference check replace a physical prototype?

No. It answers a geometry question within the selected model. The physical evaluation should address the specific uncertainties that the digital review leaves open.

Can we use a different prototype material?

Discuss it with the supplier and test owner. Record which conclusions remain meaningful with the substitute and which need evaluation using a more representative sample.

What should we do when the prototype fails?

Compare the observation with the planned criterion. Identify whether the issue concerns the design, sample construction or evaluation setup before changing the CAD model.

Discuss your prototype review with a short description of the product, the available model and the decision the sample needs to support.

If the CAD work starts from an existing physical part, review the reverse engineering scope and deliverables guide before agreeing what model the prototype will use.

Related guide: Industrial design brief for your first meeting.

Share this:

Leave a comment:

Top